|
C-55
– Water Conditioning Contractor
A
water conditioning contractor installs water conditioning equipment
with the use of only such pipe and fittings as are necessary to connect
the water conditioning equipment to the water supply system and to
by-pass all those parts of the water supply system within the premises
from which conditioned water is to be excluded.
The
Water Conditioning (C-55) examination is divided into four major
sections. These sections are:
1.
Job Planning/Estimating (21%)
- Problem
identification
- Corrective
action
- Equipment
selection
- Installation
planning
2.
Installation (46%)
- Pumps
and monitoring equipment
- Piping
- Valves
- Equipment
check, calibration, and sanitizing
- Training
and documentation
3.
Service and Maintenance (20%)
- Water
softening problems and servicing
- Reverse
osmosis
- Ozone
- Contamination
4.
Safety (13%)
- Safety
hazards
- Tool
safety and protective wear
*Percentages
are approximate*
Contractors
License Service 2012
All Rights
Reserved
Contractors
License Service |
Contractors License
School | Contractors License Classifications |
Contractors License
Expert | Contractors License Application |
California Contractors State License Board Exams
|